Posted by Paul Moore on twenty sixth November 2024
Terminal Graneles del Norte (TGN) efficiently accomplished its first trial cargo of copper focus, an essential milestone in its growth undertaking. On this operation, 10,800 t of Codelco’s calcine had been loaded onto a Handymax vessel, showcasing the terminal’s potential to deal with the rising demand for copper focus.
TGN Port is situated in Mejillones Bay on the coronary heart of Chile’s mining area some 60 km north of Antofagasta. It has a strategic location, near crucial copper district on this planet, which comprises world well-known mineral deposits.
The undertaking contains the development of a brand new berthing web site with full automated dealing with tools for receiving, storage container staking, transport and ship loading of copper focus.
Empresa Constuctora Belfi SA, is the development firm that selected Bedeschi as one of many suppliers for the brand new undertaking. The corporate designed and provided three belt feeders designed to obtain copper focus from rotating containers, an underground conveyor of roughly 400 m size within the storage yard and a pipe conveyor of roughly 950 m to attach the storage yard overland conveyor to the dock facility.
Probably the most progressive facet of this growth Bedeschi states is the mixing of automation know-how, enabling minimal human-machine interplay. All the course of runs on renewable electrical energy, reinforcing the corporate’s dedication to sustainability and its efforts to decrease its carbon footprint.
Bedeschi says it has a inexperienced product portfolio of recent and eco-friendly options designed to minimise impacts by way of noise, mud emissions, materials dispersion and so forth which meet the strictest environmental requirements. In actual fact, the pipe conveyor was chosen to ensure the dealing with of copper focus from the storage to the ship with none dispersion of fabric within the surrounding space to keep away from environmental air pollution.
It provides: “The primary cargo check not solely validated the system’s operability, but additionally affirmed the undertaking’s excessive requirements of security, effectivity, and sustainability.” The TGN Port growth is ready to start operations in January 2025, with an annual capability of 4 Mt.